Data center construction

Every unit.Set in place.

Ribbiot runs your side of data center construction on one record, from the quote to the invoice: the cranes and rigging crews at each building, the haul, the set dates that move, the gate paperwork, and every signed ticket, so the office, the yard, and the field run on the same truth.

Walk one job

Bring one job to a 60-minute discovery call. We walk it with you from the quote to the invoice and show what one record changes at each handoff.

A chiller lowered by crane onto the roof of a data center under construction, with two riggers guiding it on tag linesA rigging crew setting a generator from a lowboy trailer onto its pad beside a data center, with a crawler crane holding the loadA data center campus under construction at dawn, with crawler cranes at the buildings and a transformer on a multi-axle trailer
Data center construction: the crane, the rigging, the haul, and the signed ticket on one record
Built for the realities of the field
The daily reality

The crane is booked for Tuesday. The chillers arrive Thursday.

On a data center campus, your side of the job repeats building after building: chillers on the roof, generators and transformers on their pads, switchgear and prefabricated electrical modules rigged into place. Each unit sets its crane, its rigging, and its trailer. The manufacturer sets the day: long-lead equipment ships when the factory releases it, so a set planned for Tuesday lands on Thursday, at night, or on a weekend. The general contractor sets the rest: orientation and a badge for every operator and rigger, a lift plan it accepts before a critical lift, and a superintendent's signature on every ticket, billed against a purchase order or a change order. It runs on a delivery schedule, a whiteboard, and paper tickets, and the office learns what was signed when the tickets come back.

01

Dispatch conflicts

The generators for the second building ship late. The crane and the rigging crew booked for Tuesday are wanted Thursday, the day both are promised to the chiller set on the roof of the first building.

A crane and a crew idle on Tuesday, and two buildings that both want them Thursday.

02

Compliance risk

The relief operator sent for the night set has no site badge. The lift plan the general contractor accepted names a different crane, and the inspection papers for the crane that came are in a binder in the yard.

A night set called off at the gate, with the trucks already on site.

03

Missing field truth

The trucks arrive late and the crew stands by through the afternoon. The set runs into the night, the superintendent who watched it goes home, and the paper ticket is signed days later without the standby or the change order number on it.

An invoice sent back for backup, and an afternoon of standby nobody pays for.

From the quote to the field to the invoice

Readiness before the trucks arrive. Visibility at every building. Clarity when the job closes.

The quote, the crane and crew schedule for each building, the work order on the operator's phone, the ticket the superintendent signs the day of the set, and the invoice are one record. The office sees each set the way the crew on the roof sees it, the day it happens, and the accounting system gets the result.

Included in the platform
ArsenalArsenal

Every crane and spreader bar on its record

Arsenal holds a record for every crane, forklift, and trailer and for the spreader bars, slings, and mats, owned or rented, tracked or not, with its status, its inspections, and its load charts. The set is planned from equipment the yard knows is ready, and the crane's annual inspection opens on a phone at the gate.

RosterRoster

Who is free when the set date moves

Every operator, rigger, and signal person is on Roster with a role and the days each is committed, so when a set moves from Tuesday to Thursday the crew comes off the record and nobody spends the evening calling around. The operator's certification and the site orientation record ride with the job as documents.

IntelIntel

Planned resources for every set

The accepted quote becomes the plan automatically, and Intel adds planned resources for the crew and equipment each set requires. Sales or project management confirms them before the job goes to dispatch. Intel also reads every form as it lands and flags what needs attention. Intel proposes and a person confirms.

The modules
Pursuit

Every set priced from one book

Every set is priced in Pursuit from one price book: the crane and its mobilization, the rigging crew, the haul, the night and weekend rates, and the standby terms for a delivery that slips, so two estimators quote the next building the same way. The accepted quote becomes the plan, with nothing typed twice.

Command

One board for every building

Command builds each set from the cranes, trailers, rigging, and crews that are actually free, so a crane promised to two buildings shows at planning, while both superintendents can still be told. The lift plan, the manufacturer's rigging instructions, and the gate paperwork ride on the work order to the operator's phone.

Capture

Tickets signed the day of the set

Capture puts the forms crews already know on the phone: the crane inspection, the job safety analysis, and the time ticket with standby on its own line, ready for the superintendent to sign that day. They are submitted against the work order, work with no signal, and sync when the signal returns.

Secure

Standby and night sets, billed

Secure turns the approved hours and the signed tickets into payroll-ready and invoice-ready records for the accounting and payroll systems you already use. The standby, the night set, and the extra pick are on the invoice because the superintendent signed for each the day it happened.

Track

Where every spreader bar is

Track puts live location and tap-to-access documents on the spreader bars, lifting beams, skates, and crane mats that never carried telematics, through Ribbiot's own trackers, so the yard knows what is out on the campus and what came back. No hardware is required to be a customer.

The platform

One platform. The whole job.

Start on the workflow that hurts most and add the next when the office and the field trust what they see.

Explore the platform ↗
See the difference

The same week, in the fog and on one record.

A staged picture: a paper crane time ticket on a truck tailgate at night, standby scrawled under the remarks and the signature line empty, a crane and generators under site lights beyond.
Without Ribbiot

In the fog.

  • A crane booked for Tuesday waits while the chillers arrive Thursday.
  • A spreader bar is rented while the company's own sits at another building.
  • A rigger is turned back at the gate without the site orientation.
  • The crane's inspection papers are in a binder when the gate asks.
  • Standby for late trucks is remembered at invoice time, if at all.
  • The night set's ticket waits days for the superintendent's signature.
  • The same set is retyped for the quote, the board, and the invoice.
  • Margin on each building is known a month after the crane leaves.
A composite picture: a hand holds a phone showing a crew timecard with standby on it, signed by the customer in the Ribbiot mobile app, a crane setting a generator at night behind it. Example data.
With Ribbiot

On one record.

  • A moved set date shows against the crane's next job at planning.
  • Every spreader bar, sling, and mat has its location on the record.
  • The site orientation records are attached to the job before the crew rolls.
  • The crane's inspection papers open from its record on a phone at the gate.
  • Standby goes on the ticket when it starts, and the superintendent signs it.
  • The night set's ticket is signed and on the record the same night.
  • The set is entered once, from the quote to the invoice.
  • Margin per building shows while the decisions that set it are still in reach.

Remove the Fog of Operations

Bring one job.Get a clearer operating picture, from readiness to revenue.

Walk one job