Structural steel erection

Every piece.Bolted up.

Ribbiot runs structural steel erection on one record, from the quote to the invoice: the crane and raising gang, the bolting, welding, and decking crews behind them, the welders' papers, and every time and material ticket, so the office, the yard, and the field run on the same truth.

Walk one job

Bring one job to a 60-minute discovery call. We walk it with you from the quote to the invoice and show what one record changes at each handoff.

Two connectors on a steel frame guiding a beam into place as the crane lowers itA crawler crane lifting a roof truss over a steel frame while the raising gang watches from the groundA welder working on a column connection on a steel frame at dusk
Structural steel erection: the crane, the crews, the field fixes, and the signed tickets on one record
Built for the realities of the field
The daily reality

The holes did not line up. Nobody signed for the fix.

Structural steel goes up by sequence, and the trucks set the pace. The fabricator ships a sequence, the raising gang sets each piece, the bolting and welding crews follow, and the decking crew follows them. The crane, the gang, the welding machines, the boom lifts, and the rigging all have to be free the same days. Before the first piece is set, the site asks for the crane's inspection, each operator's certification, and each welder's qualification papers. Then the steel adds work nobody quoted: a beam fabricated short, holes that do not line up, anchor bolts out of place. Each fix is extra work on a time and material ticket, signed the day it is done or argued later. It runs on a whiteboard and a pad of paper tickets, and the office hears about the fix when the foreman turns in the pad.

01

Dispatch conflicts

The fabricator moves the next sequence up a week. The crane and the raising gang are on another job until Friday, and the welding machines and boom lifts the bolting crew needs are out there with them.

Steel stacked in the laydown yard, and a general contractor counting the days.

02

Compliance risk

Before the first piece is set, the general contractor asks for the crane's annual inspection, each operator's certification, and each welder's qualification papers. They are in a binder at the shop, a foreman's truck, and an inbox.

A raising gang on the clock at the gate, and no steel going up.

03

Missing field truth

A beam arrives with holes that do not line up. The fix takes a welder and a boom lift most of a day, and the time and material ticket is written that night from memory, with nobody's signature on it.

A back charge the fabricator disputes, and a day of labor nobody pays for.

From the quote to the field to the invoice

Readiness before the steel arrives. Visibility while it goes up. Clarity when the job closes.

The quote, the crane and crew schedule for each sequence, the work order on the foreman's phone, the time and material ticket signed the day of the work, and the invoice are one record. The office sees each sequence the way the raising gang sees it, while the steel is still going up, and the accounting system gets the result.

Included in the platform
ArsenalArsenal

Every crane, welding machine, and boom lift

Arsenal holds a record for every crane, welding machine, and boom lift and for the rigging, owned or rented, tracked or not, with its status, its inspections, and its load charts. Each sequence is planned from equipment the yard knows is ready, and the crane's annual inspection opens on a phone when the site asks.

RosterRoster

A raising gang and the crews behind it

Roster carries every operator, connector, welder, and foreman with a role and the days each is committed, so the raising gang and the crews behind it are staffed from the record when a sequence moves. Each welder's qualification papers and each operator's certification ride with the job as documents.

IntelIntel

Planned resources for every sequence

The accepted quote becomes the plan automatically, and Intel adds planned resources for the crew and equipment each sequence requires. Sales or project management confirms them before the job goes to dispatch. Intel also reads every daily report as it lands and flags what needs attention. Intel proposes and a person confirms.

The modules
Pursuit

Erection and extra work from one book

Every erection job is priced in Pursuit from one price book: the crane and its mobilization, the raising gang, the bolting, welding, and decking crews, and the time and material rates for extra work, so two estimators price the same frame the same way. The accepted quote becomes the plan, with nothing typed twice.

Command

One board for the crane and crews

Command plans each sequence from the cranes, crews, welding machines, boom lifts, and rigging that are actually free, so a raising gang promised to two jobs shows at planning instead of the morning the trucks arrive. The erection plan, the drawings, and the site's papers ride on the work order to the foreman's phone.

Capture

Tickets signed the day of the work

Capture puts the forms crews already know on the phone: the timecard, the daily report, the crane inspection, and the time and material ticket, ready for a signature that day. They are submitted against the work order, work with no signal, and sync when the signal returns.

Secure

Extra work on the invoice

Secure turns the approved hours and the signed tickets into payroll-ready and invoice-ready records for the accounting and payroll systems you already use. The field fix, the wait on late trucks, and the extra work are on the invoice or the back charge because each was signed for that day.

Track

Where the welding machines are

Track puts live location and tap-to-access documents on the welding machines, gang boxes, spreader bars, and bolting tools that never carried telematics, through Ribbiot's own trackers, so the yard knows what is on which job and what came back. No hardware is required to be a customer.

The platform

One platform. The whole job.

Start on the workflow that hurts most and add the next when the office and the field trust what they see.

Explore the platform ↗
See the difference

The same week, in the fog and on one record.

A staged picture: a paper time and material ticket for a field fix on a gang box at dusk, the hours struck and rewritten and the signature lines empty, a steel frame and a crane beyond.
Without Ribbiot

In the fog.

  • The steel arrives Monday and the crane is free on Wednesday.
  • The welding machines the next sequence needs are still on the last job.
  • A welder's qualification papers are at the shop when the inspector asks.
  • The crane's annual inspection is in a binder in the foreman's truck.
  • A field fix is written up that night from the foreman's memory.
  • The time and material ticket goes unsigned, and the extra work is disputed.
  • The job is retyped at the quote, the board, and the invoice.
  • Margin on the frame is known a month after topping out.
A composite picture: a hand holds a phone showing a signed time and material ticket for a field fix in the Ribbiot mobile app, with a crane setting a steel beam on a frame behind it. Example data.
With Ribbiot

On one record.

  • The crane and the raising gang are committed once, sequence by sequence.
  • Every welding machine and boom lift has its status and location on the record.
  • Each welder's qualification papers are attached to the job before work starts.
  • The crane's annual inspection opens from its record on a phone at the site.
  • A field fix is on a ticket the day it happens, with its hours.
  • The time and material ticket is signed on site the day of the work.
  • The job is entered once, from the quote to the invoice.
  • Margin per job shows while the decisions that set it are still in reach.

Remove the Fog of Operations

Bring one job.Get a clearer operating picture, from readiness to revenue.

Walk one job