Nuclear and government work

Every step.By procedure.

Ribbiot runs nuclear and government work on one record, from the quote to the invoice: the crane and the rigging, the crew and its training records, the engineered lift plan, the inspection records, and the hours by work order, so the office, the yard, and the field run on the same truth.

Walk one job

Bring one job to a 60-minute discovery call. We walk it with you from the quote to the invoice and show what one record changes at each handoff.

Two riggers steadying a turbine rotor that hangs from an overhead craneWorkers in protective suits watching a reactor component lifted by an overhead craneA crew rigging a large component in a transport frame on a multi-axle trailer at a military airfield
Nuclear and government work: the crane, the crew, the lift plan, and the site's paperwork on one record
Built for the realities of the field
The daily reality

The lift plan is approved. The operator's badge is not.

Inside a nuclear plant or on a military base, the lift is the short part of the job. Nuclear work may be new construction, an outage, a large component coming out, or a decommissioning that runs for years. Government work may be on a base or another secured site. Either way the site decides who gets in: a background check, a badge, and site training for every operator and rigger, and sometimes an escort. It decides how the lift is made: by a written procedure and an engineered lift plan, with inspection records for the crane and for every sling and shackle, traceable to the piece. It decides how the hours are counted: by work order or by task. The contractor keeps all of it in binders, spreadsheets, and inboxes, and the site asks for it again at closeout.

01

Dispatch conflicts

The outage moves up a week. The crane and the crew the plant has already badged are committed to another job through Friday, and nobody sees the overlap until the plant's planner calls to confirm the date.

A lift window the plant will not move, and no one else badged to make it.

02

Compliance risk

Weeks ahead, the site wants each person's training records, the crane's inspection and load test records, a certificate for every sling, and the engineered lift plan. They are in the shop's binders, an inbox, and the last job's files.

A crew turned around at the gate, and a submittal started over.

03

Missing field truth

Hours are charged to the site's work order or task. The wait for an escort and the hold before a procedure step are notes on a paper time sheet, and at closeout the site asks again for the lift records, which are in three places.

Hours argued task by task, and a closeout that waits on paper.

From the quote to the field to the invoice

Readiness before the crew reaches the gate. Visibility on every lift. Clarity at closeout.

The quote, the crane and crew schedule, the work order on the foreman's phone with the lift plan attached, the time sheet the site verifies, and the invoice are one record. The papers the gate asked for are the papers closeout asks for, kept on the job they belong to, and the accounting system gets the result.

Included in the platform
ArsenalArsenal

The crane's records and every sling's certificate

Arsenal holds a record for every crane and for each sling, shackle, and spreader bar, owned or rented, tracked or not, with its inspections, its load test, its certificate, and its status. The job is planned from equipment the yard knows is ready, and the same papers open on a phone at the gate and again at closeout.

RosterRoster

A crew named weeks before the gate

Badging starts weeks before the lift, so the names have to hold. Roster carries every operator and rigger with a role and the weeks each is committed, so the crew on the access request is still free when the job starts. The training records and badging paperwork the site requires ride with the job as documents.

IntelIntel

Planned resources for every lift

The accepted quote becomes the plan automatically, and Intel adds planned resources for the crew and equipment each lift requires. Sales or project management confirms them before the job goes to dispatch. Intel also reads every form as it lands and flags what needs attention. Intel proposes and a person confirms.

The modules
Pursuit

Training days and standby on the quote

Every job is priced in Pursuit from one price book: the crane and its mobilization, the rigging crew, the days of badging and site training, the engineering for the lift plan, and the standby terms, so two estimators price the same site the same way. The accepted quote becomes the plan, with nothing typed twice.

Command

One board for the crane and the crew

Command plans each job from the cranes, transport, rigging, and crews that are actually free, so a crew committed to two sites in the same outage window shows at planning, while the site's planner can still be told. The approved lift plan, the access paperwork, and the site's rules ride on the work order to the foreman's phone.

Capture

Hours by work order, recorded on site

Capture puts the forms crews already know on the phone: the time sheet with standby and escort waits on their own lines, the crane and rigging inspections, and the pre-job briefing, each submitted against its work order. They work with no signal and sync when the signal returns.

Secure

Verified hours onto the invoice

Secure turns the approved hours and the verified time sheets into payroll-ready and invoice-ready records for the accounting and payroll systems you already use. The escort wait, the hold, and the extra shift are on the invoice because the site verified each on the shift it happened.

Track

What went in, and what came back

Track puts live location and tap-to-access documents on the spreader bars, rigging boxes, and mats that never carried telematics, through Ribbiot's own trackers, so the yard knows what went in and what came back. What may pass the gate is the site's rule. No hardware is required to be a customer.

The platform

One platform. The whole job.

Start on the workflow that hurts most and add the next when the office and the field trust what they see.

Explore the platform ↗
See the difference

The same week, in the fog and on one record.

A staged picture: a paper crew time sheet on a clipboard inside a plant's fence, an escort wait written in the remarks, the site supervisor's signature missing, a crane and a cooling tower beyond.
Without Ribbiot

In the fog.

  • The outage moves a week, and the badged crew is on another job.
  • Training records for the gate are spread across binders and inboxes.
  • One sling's certificate cannot be found when the site asks for it.
  • Hours are charged to the wrong work order and corrected weeks later.
  • The wait for an escort is a note nobody at the site verified.
  • At closeout the site asks again, and the records are in three places.
  • The job is retyped for the quote, the schedule, and the invoice.
  • Margin on the job is known months after the crew has left.
A composite picture: a hand holds a phone showing a time sheet in the Ribbiot mobile app, an escort wait on its own line and the customer's signature, a crane at a plant gate behind. Example data.
With Ribbiot

On one record.

  • A moved outage date shows against the crew's other job at planning.
  • The training records the site requires are attached to the job beforehand.
  • Each sling's certificate opens from its record on a phone.
  • Hours are recorded against the work order the day they are worked.
  • The wait for an escort is on the time sheet, verified that shift.
  • At closeout the lift plan, the inspections, and the hours are on one record.
  • The job is entered once, from the quote to the invoice.
  • Margin per job shows while the decisions that set it are still in reach.
Also built forMegaprojects

Remove the Fog of Operations

Bring one job.Get a clearer operating picture, from readiness to revenue.

Walk one job