Drilling, boring, and auger work

Every hole.To depth.

Ribbiot runs the hole on one record, from the quote to the invoice: the rig and the tooling, the casing and the slurry, the bore pit, the crew, the locates and the crossing permit, the concrete timing, the footage and the standby, so the office, the yard, and the field run on the same truth.

Walk one job

Bring one job to a 60-minute discovery call. We walk it with you from the quote to the invoice and show what one record changes at each handoff.

A drill rig pulling a flight auger out of a shaft while two drillers guide itA crew in a bore pit checking line and grade on a casing behind an auger boring machineA service crane lowering a rebar cage into a cased shaft while two workers steady it with tag lines
Drilling, boring, and auger work: the rig, the tooling, the crew, and the hole on one record
Built for the realities of the field
The daily reality

The boring logs said clay. The auger says otherwise.

Every hole is a configuration the ground gets a vote on. On a shaft, the depth and the diameter decide the drill rig, the auger or the core barrel on the kelly bar, the casing and the slurry, the service crane beside it for the cage, and the trucks for the spoils. On a crossing, the pipe and the ground decide the auger boring machine, the bore pit, and the casing jacked under the road or the rail on line and grade. Around both sit the locates, the permit, the railroad's flagger, the access for the ready-mix trucks, and the engineer's inspection before the pour. Ground that is not what the geotechnical borings promised changes the tooling, the casing, and the day by noon, and when the board is a whiteboard and a group text, the office finds out when the rig is already on the wrong site.

01

Dispatch conflicts

Two sites ask for the same rig and the one driller certified to run it, the tooling the second hole needs is on a trailer at the first, and the locate for the third site's crossing expires on Thursday.

A rig that sits for a day while the locate is called in again.

02

Compliance risk

The inspector wants the rig inspection and the driller's certification before the first auger turns, the gate wants the site-specific training, and the locate ticket that proves the call was made is in the pickup at the last hole.

A concrete order pushed a day for paperwork that exists.

03

Missing field truth

The shaft log or the bore log, the footage, the casing left in the ground, the standby waiting on concrete, and the obstruction that took a morning come back on paper days later, and the office rebuilds the week from the driller's texts and a photo of the log.

The engineer's copy of the log decides what gets paid.

From the quote to the field to the invoice

Readiness before the rig rolls. Visibility while the hole goes down. Clarity when the job closes.

The quote, the rig and crew schedule, the work order on the driller's phone, the daily drilling report, the signed ticket with the footage and the standby, and the invoice are one record. The office sees the hole the way the crew on the site sees it, while it is being drilled, and the accounting system gets the result.

Included in the platform
ArsenalArsenal

The rig, the tooling, and whether they can roll

Every drill rig, auger boring machine, and piece of tooling that goes out with them has a record in Arsenal, owned or rented, tracked or not, with its inspection and its status. The day is planned from tooling the yard knows is ready, and the rig inspection comes off the record onto a phone at the hole.

RosterRoster

A driller for every rig, a crew for every hole

Every driller, operator, and laborer is on Roster with a role and the days each is on a site, so the week's holes are crewed from the record and the driller who runs the big rig is on one site at a time. The driller's certification is attached to the hole as a document.

IntelIntel

Planned resources for every hole

The accepted quote becomes the plan automatically, and Intel, Ribbiot's AI, adds planned resources for the crew and equipment each hole requires. Sales or project management confirms them before the job goes to dispatch. Intel also reads every daily report as it lands and flags what needs attention. Intel proposes and a person confirms.

The modules
Pursuit

The shaft and the crossing, priced from one book

One price book prices every shaft and crossing in Pursuit: the rig and the tooling, the footage by diameter, the permanent casing, the obstruction rate, and the standby terms, so two estimators quote the same way and the daily report is signed against the same terms. The accepted quote is the plan, with nothing retyped.

Command

Scheduling and dispatch

Command builds the day from the rigs, the tooling, the service crane, and the drillers that are actually free, so a rig promised to two sites shows at planning, while the second site can still be moved. The locate tickets with their expiration dates, the permit, and the site training ride on the work order to the driller's phone.

Capture

Daily reports from the site

Capture puts the forms crews already know on the phone: the daily drilling report, the shaft or bore log, the timecard, the inspection, and the customer's signature on the footage and the standby, submitted against the work order the same day and built to work where the bore pit has no signal.

Secure

Payroll and billing from the record

Secure hands the payroll and accounting systems you already use the approved hours and the signed ticket as payroll-ready and invoice-ready records. The footage, the casing left in the ground, the obstruction time, and the standby come off the daily report the customer signed.

Track

Where the tooling is

Track puts live location and tap-to-access documents on the augers, the core barrels, the cleanout buckets, the casing, and the cutting heads telematics never covered, so Thursday's tooling is found on Wednesday. No hardware is required to be a customer.

The platform

One platform. The whole job.

Start on the workflow that hurts most and add the next when the office and the field trust what they see.

Explore the platform ↗
See the difference

The same week, in the fog and on one record.

A staged picture: a paper daily drilling report on a clipboard in the bed of a muddy pickup, mud across the totals and no customer signature, a drill rig on the site beyond.
Without Ribbiot

In the fog.

  • A rig is promised to two sites.
  • The tooling is on a trailer at the wrong hole.
  • A locate expires before the rig arrives.
  • Concrete standby is written in the margin of the log and never billed.
  • The shaft log or the bore log stays on paper for a week.
  • A rig inspection is found expired the morning the auger is due to turn.
  • The hole is retyped at the quote, the board, and the invoice.
  • Margin per hole is known a month after the pour.
A composite picture: a hand holds a phone showing a signed daily drilling report in the Ribbiot mobile app, over muddy ground where a drill rig's auger drops clay into a cased hole. Example data.
With Ribbiot

On one record.

  • The rig, the tooling, and the driller are committed once, to one hole.
  • Every rig and every tool is on the record, with its location and papers.
  • Locates and permits are on the job, with their dates, before the rig rolls.
  • The daily drilling report and the footage are on the record before the crew leaves the site.
  • Obstruction time and concrete standby are signed for on the site, so they get billed.
  • A locate about to expire shows at planning, before the morning of the hole.
  • The hole is entered once, from the quote to the invoice.
  • Margin per hole shows while the decisions that set it are still in reach.
Also built forPile driving

Remove the Fog of Operations

Bring one job.Get a clearer operating picture, from readiness to revenue.

Walk one job