Energy and power work

Every site.One job.

Ribbiot runs the wind turbine erection, the nuclear outage lift, and the transformer move on one record, from the quote to the invoice: the cranes, the transport, the rigging, the crew, the site's requirements, and the standby, so the office, the yard, and the field run on the same truth.

Walk one job

Bring one job to a 60-minute discovery call. We walk it with you from the quote to the invoice and show what one record changes at each handoff.

A wind turbine nacelle on a multi-axle transporter under a crane's hook, a wind farm behind itA crawler crane and an assist crane erecting a wind turbine on a desert ridgeLinemen on a transmission tower under a crane boom, with heavy clouds behind
Energy and power work: the crane, the haul, the rigging, and the site's papers on one record
Built for the realities of the field
The daily reality

The crane is on the ridge. The ticket is in the truck.

An energy job is three jobs sold as one. The component sets the transport: the trailer, the permits state by state, the escorts, and the bridge that can re-decide it all. The pick sets the crane: the loads that build it up, the assist crane, the mats, and the rigging. The site sets the rest. On a wind site that is the access road, the pad, the wind, and no signal. Inside a nuclear plant it is the outage window, the lift plan and its load path, the crane's inspection records, and the unescorted access each person needs to pass the gate. The company sells one service and runs it by whiteboard, permit binder, and phone, and the office hears what happened when the paper arrives.

01

Dispatch conflicts

The crawler is promised to two wind sites, the trailers that carry its boom sections are out on a transformer move, and the assist crane was released to another job on Friday.

A crew out of town and a nacelle on the pad with no crane to set it.

02

Compliance risk

The wind site wants the crane's annual inspection before the first pick. The plant wants the lift plan and each person's access paperwork before the outage. The papers are in a binder, an inbox, and a truck on another site.

The outage clock runs while the lift waits on paper that exists.

03

Missing field truth

On a ridge with no signal, the time ticket and the daily crane inspection are written at the tower base, signed in the wind, carried to the truck, and typed up days later. When the wind stops the lift, nobody writes it down.

Standby argued from memory after the crane has left the site.

From the quote to the field to the invoice

Readiness before the gate. Visibility from the ridge. Clarity when the job closes.

The quote, the crane and transport schedule, the work order on the operator's phone, the verified ticket with the standby, and the invoice are one record. The lift, the haul, and the rigging run as one job. What the crew records with no signal syncs to the job record by itself when the signal returns, and the accounting system gets the result.

Included in the platform
ArsenalArsenal

The crawler and every load that builds it

Arsenal gives every crane, boom section, counterweight, tractor, trailer, and mat its own record, owned or rented, tracked or not, with its capacity, its status, its inspections, and its load charts. The yard knows what is ready before the first load leaves, and the crane's papers open on a phone when a plant asks.

RosterRoster

The wind crew and the outage crew, by the week

A wind job or an outage takes a crew out of town for weeks. Roster carries every operator, rigger, and driver with a role and the weeks each is away or open, so both crews are staffed from the record. The operator certifications and the site training records a plant requires ride with the job as documents.

IntelIntel

Planned resources for every site

The accepted quote becomes the plan automatically, and Intel adds planned resources for the crew and equipment the lift and the haul require. Sales or project management confirms them before the job goes to dispatch. Intel also reads every form as it comes in from the site and flags what needs attention. Intel proposes and a person confirms.

The modules
Pursuit

The crane, the haul, and the rigging on one quote

One price book in Pursuit prices the whole scope: the crane and its mobilization, the haul with its tractors and trailers, the rigging crew, and the standby terms for a wind day or an outage that slips. The accepted quote becomes the plan, with nothing retyped.

Command

One board for lift and haul

Command builds the job from the cranes, tractors, trailers, and crews that are actually free, so a crawler promised to two sites shows at planning instead of on the pad. The haul, the crane build, the lift, and the breakdown are tasks on one job, and the lift plan, the permits, and the plant's papers ride on the work order.

Capture

Tickets from the tower base

Capture puts the forms crews know on the phone: the time ticket with the standby, the crane inspection, the job safety analysis, and the customer's verification. The app works where there is no signal, for forms, time entry, and job information, and syncs by itself when the signal returns.

Secure

Hours and standby onto the invoice

Secure turns the approved hours and the verified ticket into payroll-ready and invoice-ready records for the payroll and accounting systems you already use. The standby, the travel, and the extra pick are on the invoice because the crew recorded them on site and the customer verified.

Track

Where the mats and the rigging are

Track puts location and tap-to-access documents on the crane mats, the spreader bars, and the rigging that telematics never covered, so the yard sees what is still out on a site. Tractors and cranes come in through the telematics the fleet already carries. No hardware is required to be a customer.

The platform

One platform. The whole job.

Start on the workflow that hurts most and add the next when the office and the field trust what they see.

Explore the platform ↗
See the difference

The same week, in the fog and on one record.

A staged picture: a gloved hand steadies a paper crane time ticket on a truck hood by a wind turbine tower, a wind delay written across it and the signature line empty, a crawler crane beyond.
Without Ribbiot

In the fog.

  • A crawler is promised to two wind sites.
  • The crawler's trailers are out on a transformer move.
  • Time tickets are carried to the truck and typed up days later.
  • A wind delay is written in afterward, from memory.
  • The crane's papers are in a binder when the plant gate asks.
  • Site training is found missing the morning the outage starts.
  • One job is retyped for the crane, the haul, and the invoice.
  • Margin per site is known a month after the crane leaves.
A composite picture: a hand holds a phone showing a crane timecard with a wind delay, ready to verify in the Ribbiot mobile app, with a crane boom beside a wind turbine behind it. Example data.
With Ribbiot

On one record.

  • The crawler, the trailers, and the crew are committed once, to one site.
  • The haul, the crane build, the lift, and the breakdown are tasks on one job.
  • Forms and time entry are filled in on the phone with no signal and sync when the signal returns.
  • The wind delay is on the ticket when it starts, and is verified at the tower base.
  • The crane's inspections and load charts are on its record when the plant asks.
  • The training records a plant requires are attached to the job before the crew rolls.
  • The job is entered once, from the quote to the invoice.
  • Margin per site shows while the decisions that set it are still in reach.

Remove the Fog of Operations

Bring one job.Get a clearer operating picture, from readiness to revenue.

Walk one job