Megaprojects

Every pick.On the record.

Ribbiot runs your side of a megaproject on one record, from the quote to the invoice: the cranes and crews on every shift, the permitted night hauls, the lift plans and inspections the owner asks for, and years of signed tickets, so the office, the yard, and the field run on the same truth.

Walk one job

Bring one job to a 60-minute discovery call. We walk it with you from the quote to the invoice and show what one record changes at each handoff.

Aerial view of a stadium under construction, its roof frame partly coveredA crew seated on a beam high inside a stadium under constructionA wrapped oversize load on a multi-axle trailer
Megaprojects: every crane, every shift, every night haul, and every signed ticket on one record
Built for the realities of the field
The daily reality

The next stadium is out to bid. Can you run it on paper?

To a crane and rigging contractor, a stadium, an airport terminal, or a bridge is years of work on one site. Several cranes stand at once, each with its own operators and riggers and its own inspections coming due. Crews work several shifts. Oversize loads move at night under permits and escorts, and each one has to meet a crane that is rigged and waiting. The picks run into the hundreds, the critical ones each with an engineered lift plan, and the owner and the general contractor expect any record the day they ask for it: last spring's lift plan, last month's crane inspection, the signed ticket for one night of standby. The usual tools are a whiteboard, a binder, and paper tickets. The question a megaproject asks is whether the next one can be won, staffed, and billed that way.

01

Dispatch conflicts

A roof truss is permitted to move Tuesday night, with escorts and a road closure. The crawler that sets it is still rigged for a pick across the site, and its night operator was moved to days.

A permitted load parked for the night, and a road closure to apply for again.

02

Compliance risk

The owner's safety team asks for one crane's inspections since it was assembled, the lift plan for a pick made last spring, and the certification of the operator who made it. The answers are in a trailer, a storage box, and a truck.

Days spent finding one paper, with the owner waiting on the answer.

03

Missing field truth

Every shift writes tickets for standby, extra picks, and hook time for the other trades. Each needs a superintendent's signature, the superintendents change with the shifts, and the month's billing is rebuilt from a box of paper.

A month's invoice that goes out late, without the tickets nobody could find.

From the quote to the field to the invoice

Readiness before the first pick. Visibility across every crane. Clarity when each month closes.

The quote, the schedule for every crane and crew, the work order on the operator's phone, the daily inspections, the signed tickets, and the invoice are one record for as long as the job runs. The office sees the site the way the crews see it, any record the owner asks for is on it, and the accounting system gets the result.

Included in the platform
ArsenalArsenal

Every crane on the site, on its record

Arsenal holds a record for every crane, tractor, and trailer and for the rigging, the mats, and the spreader bars, owned or rented, tracked or not, with its status, its inspections, and its load charts. Each crane's inspections, from the day it is assembled, sit on its record and open on a phone when the owner asks.

RosterRoster

A crew for every crane and every shift

Roster carries every operator, oiler, rigger, and driver with a role and the shifts each is committed, so every crane on every shift is crewed from the record, and a relief operator for nights is found without an evening of calls. The operator certifications and the orientation records ride with the job as documents.

IntelIntel

Planned resources for every phase

The accepted quote becomes the plan automatically, and Intel adds planned resources for the crew and equipment each phase requires. Sales or project management confirms them before the job goes to dispatch. Intel also reads every crane inspection as it lands and flags what needs attention. Intel proposes and a person confirms.

The modules
Pursuit

Years of work, priced from one book

Every scope on the job is priced in Pursuit from one price book: each crane by the month, the operators by the shift, the assembly and the moves, the permitted night hauls, and the standby terms, so every estimator on the job prices it the same way. The accepted quote becomes the plan, with nothing typed twice.

Command

One board for every crane and shift

Command plans every shift from the cranes, transport, rigging, and crews that are actually free, so a crawler promised to two picks on the same night shows at planning, before the load leaves the yard. The haul, the crane move, and the pick are tasks on one job, and the lift plan and the permits ride on the work order.

Capture

Tickets and inspections, every shift

Capture puts the forms crews already know on the phone: the crane inspection, the time ticket, and the daily report, submitted against the work order each shift. They work with no signal and sync when the signal returns. A finding on an inspection reaches the right person that day.

Secure

Monthly billing from signed tickets

Secure turns the approved hours and the signed tickets into payroll-ready and invoice-ready records for the accounting and payroll systems you already use. The standby, the night shift, and the extra picks are on that month's invoice because each was signed for on the shift it happened.

Track

Where every mat and spreader bar is

A site this size swallows crane mats, spreader bars, rigging boxes, and personnel baskets. Track puts live location and tap-to-access documents on gear that never carried telematics, through Ribbiot's own trackers, so the yard knows what is on the site and where. No hardware is required to be a customer.

The platform

One platform. The whole job.

Start on the workflow that hurts most and add the next when the office and the field trust what they see.

Explore the platform ↗
See the difference

The same week, in the fog and on one record.

A staged picture: a paper crane shift ticket on a box of tickets in a site trailer, the night's standby written on it and the superintendent's signature line empty, cranes at a stadium site beyond.
Without Ribbiot

In the fog.

  • One crawler is promised to two picks on the same night.
  • A permitted night haul arrives at a crane that is not ready.
  • Last spring's lift plan is in a box in a site trailer.
  • One crane's inspection history is spread across several log books.
  • Standby tickets wait days for a superintendent who changed shifts.
  • The month's billing is rebuilt from boxes of paper tickets.
  • The job is retyped for the bid, the board, and every invoice.
  • Margin on a job that runs for years is known at the end.
A composite picture: a hand holds a phone showing a night shift's crane timecard with standby, ready to verify in the Ribbiot mobile app, a crane and an arena's steel frame behind it. Example data.
With Ribbiot

On one record.

  • Every crane and every crew is committed once, shift by shift.
  • The haul, the crane move, and the pick are tasks on one job.
  • Each pick's lift plan stays on its work order, ready when the owner asks.
  • Every crane's inspections sit on its record from the day it is assembled.
  • Standby goes on the ticket that shift, and the superintendent signs it.
  • The month's invoice is built from tickets already signed on the record.
  • The job is entered once, from the quote to the invoice.
  • Margin per job shows while the decisions that set it are still in reach.
Also built forConcrete pumping

Remove the Fog of Operations

Bring one job.Get a clearer operating picture, from readiness to revenue.

Walk one job